I have finally finished sealing the basement walls, or at least the largest section of it before some construction can begin. I originally wanted to finish this before Jan 1, but I was really underestimating the amount of work to be done. Next, I need to finish leveling the large section of floor that was not even close to being flush. This won’t level out the entire floor, but it’s a good start, and then I can decide what I want to do from there for the finished surface.

Here’s a shot of the walls before I even started applying anything:

img_3419

Halfway through:

img_3502

Finished:

img_3823

Here is another look at the largest exterior wall with my finished work. You can notice some color difference between where I started and the last section I did on the upper third of the wall:

img_3824

Here is what it looked like halfway through, back in December:

img_3501